CABLE DRUM BRIDGE

RETROFITTABLE - CLEVER - SIMPLE.

The “transition,” the transformation of energy generation from fossil fuels to sustainable and socio-ecologically compatible alternatives, is an ambitious project for many national economies. Bigger, more powerful, more efficient: New requirements are not only pushing the infrastructure, legislation, and the components themselves to their limits. In heavy-duty transport, too, cargo that is usually large and heavy must reach its destination with increasingly efficient
solutions. Whereas the construction and expansion of facilities for the generation of renewable energy plants has been in the foreground up to now,
the focus is increasingly shifting to downstream processes. New power lines and grids must be built. The energy generated is fed into increasingly
intelligent networks (so-called “smart grids”) to reach the end consumer. Their expansion constitutes a huge logistical undertaking. One central element for the new electricity highways are cables with a diameter of approx. 150 mm and a length of up to 2.5 km, which are transported to the construction site between the transmission joint bays on huge cable drums. 

SEND REQUEST NOW!

Your benefits
  • Flexible combination with Goldhofer module fleet
  • Low investment and transport costs

 

  • Low overall train length and height, and low overall weight
  • Simplified approval

 

  • Transport incl. unwinding “from a single source”
  • Tapping new market potential through unprecedented efficiency

 